Tariff Relief. Up to 10% Protection.
Tariff Relief. Up to 10% Protection.

Video of How to Parallel Hipower Mobile Generators

Reliable power is essential for any operation, and sometimes a single generator isn’t the optimal solution. That’s where paralleling comes in, the process of connecting two or more generators to work together as a unified power source. Paralleling offers flexibility, redundancy, and scalability, allowing you to meet changing load requirements with maximum efficiency and flexibility.

Why Paralleling Generators Makes Sense

Paralleling is commonly used in industries like construction, manufacturing, events, and emergency response, where power demands vary and uptime is critical. The main advantages include:

  • Scalability: Easily increase available power by adding more units to match load requirements.
  • Redundancy: If one generator requires maintenance, others continue to provide power, reducing downtime.
  • Efficiency: Run only the generators you need, saving fuel and extending equipment life.
  • Flexibility: Combine generators of different sizes to match your application.

By paralleling multiple generators, you gain a more resilient and adaptable power solution than relying on a single large unit.

Step-by-Step: Paralleling Hipower Mobile Generators

Hipower’s mobile generator line makes paralleling simple with integrated digital controls and user-friendly interfaces. In the video above, you’ll see how to:

  • Configure each generator’s control panel for paralleling mode.
  • Synchronize voltage, frequency, and phase.
  • Connect units via the communication cable and verify readiness.
  • Bring each unit online and share load evenly across the system.

This step-by-step video is a great resource for operators and project managers looking to maximize the performance of their power systems.

Hipower T4F Mobile Diesel Generators In-Stock

Global Power Supply is proud to be an authorized Hipower distributor. We currently have Hipower mobile diesel generators in-stock ranging from 36 kW to 1100 kW, these units meet Tier 4 Final emissions standards and are ideal for paralleling applications across construction, disaster recovery, manufacturing, or anywhere reliable and scalable power is needed.

Our team can help you design and configure a paralleled power system that meets your exact load requirements, with units ready to ship today.

Contact us to learn more about Hipower’s paralleling capabilities or to request a quote on our in-stock models.